Plankwall will be closed for the end of year shut down from midday Tuesday 22 December until Wednesday 13th January. Happy Holidays!

Calext Wall-Mounted Brochure & Magazine Display System

Save space while showcasing your printed materials with style and simplicity. The Calext Display System is a sleek, modular, wall-mounted rack for displaying brochures, magazines, catalogs, and other print media without clutter.

Designed for versatility and visual clarity, Calext features adjustable-width acrylic holders that accommodate a wide range of print sizes—from slim brochures to full-format magazines—with ease. Mounted directly onto a Plankwall slatwall panel, this modular display system offers a clean, professional way to organize and present print media in offices, retail environments, showrooms, and reception areas. The clear acrylic construction ensures full visibility of your materials while maintaining a sleek, minimalist aesthetic.

Whether you're displaying promotional brochures, editorial magazines, or informational leaflets, Calext adapts to your layout and content needs—making it one of the most flexible and elegant brochure wall racks on the market.

Key Features:

  • Smart Modular Design: Adjust the width of the shelf dividers as needed to fit brochures, magazines, catalogs, and flyers
  • Clear Visibility: Clear acrylic holders for full visibility and a modern presentation
  • Flexibility: Slatwall-mounted for easy installation and modular expansion
  • Expandable & Versatile: Add more rows or accessories as your needs grow
  • Space-saving: Calext attaches directly onto existing walls 
  • Easy to Install: Mount to any wall with screws or using Plankwall’s Split Rail system.

Perfect For:

  • Retail stores: Greeting Cards and Magazine Racks
  • Medical clinics: Leaflet and health literature holders in waiting rooms
  • Tourist centres: Maps, guides, and brochure wall display systems
  • Schools & Universities: Acrylic wall-mounted print organisers for student information and career centres  with flyers, job boards, and course info leaflets
  • Offices & reception areas needing tidy, professional document displays for print media

Calext Standard (2400w x 1200H) Kitset includes:

  • Plankwall slatwall panel - 100mm or 150mm pitch landscape
  • Calext tracks
  • End brackets
  • Document dividers
  • Split Rail  mounting rails (optional)
  • Assembly Instructions

Dimensions per 2400W x 1200H Panel:

 Slatwall Groove Pitch (mm) # Tracks per panel Dividers & End Brackets (mm) Shelf Display Height (mm)
75 14 Small -160H 160
100 10 Small -160H 200
150 6 Large -220H 240
200 4 Large -220H 280

Whether you're organising brochures, magazines, or promotional cards, Calext helps you do it smarter, cleaner, and more professionally.

A range of custom sizes & configurations, including single width magazine racks are also available. Please enquire for more details.

Components also sold separately:

Product Code:
CALEXT

Visit our full Signage & Print Displays collection for brochure systems, poster frames and display walls.

 

...